【DO!BOOK・ページリンク】
valve_piping   211 / 222

BOOKをみる

10秒後にBOOKのページに移動します


209 Name of Operation Description of Operation Notes 8) Insertion / Holding Immediately after applying the solvent cement, insert the pipe into the socket in a stroke. After complete insertion, hold the pipe and fitting to prevent from coming out. * In case of the Nom. Size of 65A and above, use the insertion tool such as Puller, Lever- Block etc. Insert watching the guideline as a guide. Don’t strike the pipe into the socket with a hammer, or the like. Don’t twist but insert the pipe straight. Hold the pipe for 1 minute and more in summer, or for 2 minutes and more in winter, because the taper of socket may cause the pipe coming out from the socket. 9) Wiping Off Wipe off the excess solvent cement pressed out from the joined portion. Use waste cloth. 10) Curing Cure the piping for 24 hours and more in the summer or 72 hours and more in the winter without loading on the joined portion. Good ventilation on the welded portion is desirable for complete evaporation of the solvent in the solvent cement [to avoid ossible solvent cracking].