yDO!BOOKEƒy[ƒWƒŠƒ“ƒNz
valve_piping@@@214 / 222

BOOK‚ð‚Ý‚é

10•bŒã‚ÉBOOK‚̃y[ƒW‚Ɉړ®‚µ‚Ü‚·


212 After applying the primer, fill in Q-coat putty which preliminarily well pug with 1-2% volume ratio of hardener, and apply it to the junction to a smooth finish with spatula. Add a curing agent to polyester resin, apply them to the junction with a spatula or roller, and build a lamination of glass fiber impregnated with polyester resin. Mixing Ratios and Setting Times iVolume ratios to 100 of polyester resinj Outside air temperature Curing agent 0.5“ 1“ 2“ 10Ž | 42min 14min 20Ž 45min 20min 7min 30Ž 20min 7min | 40Ž 5min | | It is recommended that piping supports are installed in the straight runs. Refer to the table below to determine the proper spacing distance. AV Pipe - Type SU UnitFm Size Temperature 13mm` 25mm 30mm` 50mm 65mm` 100mm 125mm` 150mm 200mm` 300mm 350mm` 400mm 450mm` 500mm 600mm` 700mm 20Ž 1.0 1.5 2.0 2.25 2.5 2.75 3.0 3.5 50Ž 1.0 1.5 1.75 2.0 2.25 2.5 2.75 3.0 80Ž 1.0 1.25 1.5 1.75 2.0 2.25 2.5 2.75 AV Pipe - Type GU UnitFm Size Temperature 13mm` 25mm 30mm` 40mm 50mm` 65mm 80mm` 125mm 150mm` 250mm 300mm` 350mm 400mm` 500mm 600mm` 700mm 20Ž 1.0 1.5 2.0 2.25 2.75 2.75 3.0 3.5 60Ž 1.0 1.25 1.75 2.0 2.5 2.5 2.75 3.25 95Ž 1.0 1.25 1.5 1.75 2.0 2.0 2.75 3.0 ‚V ‚W Intervals between Supports for AV PIPE Type SU and Type GU